Feasibility (S2B). EIRR 14-16%. Total cascade 800-1,000 MW. Annual production 4,800-6,000 GWh.
Description
Cascade of 5-7 hydropower plants on the Luapula River (Zambia-DRC border) with combined capacity of 800-1,000 MW. Run-of-river configurations to minimise environmental impact. Implementation by ZESCO (Zambia) and SNEL (DRC). Annual energy production 4,800-6,000 GWh.
Capex Cost
540.00USD million
Preparation Cost
35.00
Revenue Model
Long-term PPAs with ZESCO and SNEL on 50-50 basis
Project Risk
Hydrological uncertainties; Technical cascade challenges; Zambia-DRC coordination; Financing complexity for phased development