Description
ECOWAS Master Plan priority project. Two hydroelectric plants on Bandama River, Cote d'Ivoire. Louga 1: 55m reservoir (297.6M m3), 1,683m dam, 3 bulbous units, 126 MW. Louga 2: 30m reservoir (170M m3), 1,200m dam, 3 bulbous units, 120 MW. Annual production 646 GWh for WAPP grid. Supports 42% renewable energy target by 2030.