Two major hydroelectric sites on Ogooue River in Gabon. Booue: 200-220 MW; Tsengue-Leledi: 150-180 MW. Combined 350-400 MW. Reduces Gabon dependence on thermal generation. Ministry of Energy and Hydraulic Resources (Gabon) and Gabon Power Company (GPC). ~300 km associated 225kV transmission lines.
Capex Cost
1,784.10USD million
Preparation Cost
28.00
Revenue Model
Long-term PPAs with SEEG as primary offtaker, with direct sales to major industrial customers
Project Risk
Hydrological variability; Geological challenges; Cost escalations for remote sites; Dam and transmission coordination